Administrative Rules for
PART 115 SOLID WASTE MANAGEMENT ACT
of the Natural Resources and Environmental Protection Act 1994 PA 451, as
amended
(Effective October 7, 1993; revised April 12, 1999)
Rule317.
(1) The owner or operator of a type III landfill shall place landfill cover materials that are described in R 299.4304 over the entire surface of each portion of the final lift not more than 6 months after the placement of solid waste within that portion.
(2) Erosion control measures shall be instituted during closure and throughout the postclosure period to minimize erosion of the final cover. The measures shall comply with part 91 of the act.
(3) Final cover depths shall be maintained for a period of 30 years after the final cover is certified in accordance with this rule.
(4) All final covered areas shall be seeded and stabilized as soon as practical after placement of final cover. Appropriate seed for the soil type, slope, and moisture condition shall be selected for this purpose. The owner or operator shall regularly inspect seeded areas during and after closure and shall take measures to assure that the vegetation is established and maintained.
These administrative rules are provided as a free service
of the State Bar of Michigan Environmental Law Section. The administrative rules, which were
re-formatted for consistency, are not intended to replace official versions and
are subject to revision and/or repeal.
The Environmental Law Section presents this information, without
warranties, express or implied, regarding the accuracy of the information,
timeliness, or completeness. If you believe the information is inaccurate,
out-of-date, or incomplete or if you have problems accessing or reading the
information, please send your concerns to the Section.